Residential
Overview
 
SNAP SHOT

ADDRESS403/1 Dakshindari Road (on the Main VIP Road) Kolkata 700 048
TOWERS 2
MODULE TYPE 2B+2G+17
UNITS 3/4 BHK, 236
CONFIGURATION 1521 Sqft - 1940 Sqft
POSSESION DATE 2014 onwards
 
E- Brochure
 
 
  Adjudged ‘Best Residential Project – Mid Segment, Kolkata’ at the CNBC Awaaz Real Estate Awards '14
Under construction Twin Towers situated on the main VIP Road between Ultadanga & Laketown
236 swank 3/4 BHK apartments with Servant Quarters
Commercial Block having 70000 Sq. Ft. Hypermarket of BIG BAZAAR, and restaurant, bank, ATM and showrooms
   Excellent connectivity –
10 mins to International Airport – Netaji Subhash Chandra Bose International Airport.
10 mins to Metro Station – Belgachia.
5 mins to Railway Station – Bidhannagar
5 – 10 mins to leading Hospitals – Apollo Gleneagles, Columbia Asia, Saltlake AMRI.
5 – 10 mins to reputed Educational Institutions – Haryana Vidyamandir, Bharatiya Vidya Bhavan, IBRAD School of Management, B P Poddar Institute of Management & Technology.
5 – 10 mins to reputed Malls & Multiplexes – Mani Square, City Centre – I & II, Diamond Plaza, Orchid Point.
5 – 10 mins to Cultural Centres – Eastern Zonal Cultural Centre, Swabhumi.
5 – 10 mins. to Sports facilities – Saltlake Stadium, Sports Authority of India, Joydeep Mukherjee Tennis Academy
Banquet Halls, Coffee Shops, Restaurants & Eating Joints nearby – Gokul Banquets, Cafe Coffee Day, Dominos, Subway, KFC.
East–West Metro link under construction nearby.
Less than 150 mtrs from Flyover connecting VIP Road to E M Bypass.
Close to Flyover under construction through Keshtopur towards Airport.
Several modern facilities & amenities.
Possession 2014 onwards
To lead the tranquil and comfortable lifestyle of tomorrow.
Plans
+   Master Plan
+   Floor Plans
   
Location

Sketch Map
 
Google Map
Facilities
  Swimming Pool
Gym, Health Club with massage & steam room and jacuzzi
Indoor Games – Pool table, table tennis, other board games
Multi-purpose Court
Yoga and Meditation Hall
AC Community Hall / Lounge Hall
 
Basic Facilities
  Landscape garden
Children’s play area with equipment
Round the clock security with surveillance camera in all common areas
Water filtration with De-ionisation plant
Intercom facility
Jogging Track
24 x 7 Generator Back-up
Garbage Chute
2 Nos. Service cum Stretcher Elevators
Specifications
StructureR.C.C. frame Structure
External FinishLatest available durable outer finish
StaircaseSpacious staircase in Kota Stone
LobbyGround floor lobby with granite / marble / vitrified tiles
Floor lobby with good quality tiles
BalconyDecorative with MS railings
FlooringVitrified tiles in living room, dining room, bedrooms, balcony & kitchen
Anti-skid tiles in toilets
Kitchen Counter – Granite Slab with stainless steel sink
Ceramic tiles up to 2 ft. height above platform
ToiletsTiles up to door height
Hot & cold water point
European style WC and basin of reputed make
Elegant C.P. fittings of Jaquar or equivalent make
WindowsAnodized Aluminum Windows
DoorsEntrance – Paneled polished door
Others – Good quality flush doors
LiftsHigh speed lifts of reputed make
Fire FightingAll necessary provision for modern Fire-Fighting
Interior FinishSmooth finish plaster of Paris on walls
ElectricalsConcealed Copper wiring with latest modular switches
Provision for AC, TV & Telephone points in living room & all bedrooms
Provision for power points and exhaust fan points in kitchen & toilets
Water Supply24 hrs filtered water supply
Model Unit
 
 
 
 
 
Availability
 
 
TOWER 1 1 1 1 1 1 1
Flat Type A B C D E F G
SBA (Sq. Ft.) 1892 1523 1521 1940 1873 1615 1934
BHK 4 3 3 4 4 3 4
1st Floor              
2nd Floor              
3rd Floor              
4th Floor              
5th Floor              
6th Floor              
7th Floor              
8th Floor              
9th Floor              
10th Floor              
11th Floor              
12th Floor              
13th Floor              
14th Floor              
15th Floor              
16th Floor              
17th Floor              
               
TOWER 2 2 2 2 2 2 2
Flat Type H I J K L M N
SBA (Sq. Ft.) 1934 1615 1873 1940 1521 1523 1892
BHK 4 3 4 4 3 3 4
1st Floor              
2nd Floor              
3rd Floor              
4th Floor              
5th Floor              
6th Floor              
7th Floor              
8th Floor              
9th Floor              
10th Floor              
11th Floor              
12th Floor              
13th Floor              
14th Floor              
15th Floor              
16th Floor              
17th Floor              
Construction Status

Work in Progress as on July, 2015

Ready for Possession


 
 

 

 

 

 

 
 
 
 
 
 
Price
+ Price Calculator
Under Construction
 
+ Payment Schedule
Basic Consideration = Base Price of the flat + Floor Rise charges + Servant Quarter Price + Car Parking Price (wherever applicable)

Booking

Rs. 5,00,000/-

On Agreement 

 (10% or Rs. 5,00,000/- whichever is higher)

10% of Basic Consideration less: Rs. 5,00,000/-

+ 50% of Legal Charges

On Completion of Foundation

(Basement Raft)

10% of Basic Consideration

On Completion of Ground floor Roof Casting

10% of Basic Consideration

On Completion of 2nd floor Roof Casting

10% of Basic Consideration

On Completion of 4th floor Roof Casting

5% of Basic Consideration

On Completion of 6th floor Roof Casting

5% of Basic Consideration

On Completion of 8th floor Roof Casting

5% of Basic Consideration

On Completion of 10th floor Roof Casting

10% of Basic Consideration

On Completion of 12th floor Roof Casting

5% of Basic Consideration

On Completion of 14th floor Roof Casting

5% of Basic Consideration

On Completion of 16th floor Roof Casting

5% of Basic Consideration

On Completion of 17th floor Roof Casting

5% of Basic Consideration

On Completion of Brick Work of the Unit

5% of Basic Consideration

On Completion of Flooring of the Unit

5% of Basic Consideration

On Possession

5% of Basic Consideration + Extra Charges**

 

** Extra Charges

Generator Power Back-up

    3 BDR (100 Watts)

    4 BDR (1500 Watts)

 

Rs. 20,000/-

Rs. 25,000/-

Transformer & Electrical Expenses

Rs. 20,000/-

Fire Fighting System

Rs. 20,000/-

Formation of Society

Rs. 1,000/-

Security Deposit for Maintenance

3 BDR

4 BDR

 

Rs. 15,000/-

Rs. 25,000/-

Professional Fees for Mutation and Assessment

Rs. 3,000/-

Legal Charges

On Agreement

On Conveyance

 

Rs. 10,000/-

Rs. 10,000/-

Grills for Windows & Balcony

At extra cost

Registration Charges

Stamp Duty, Registration Charges, Incidental expenses, Govt. taxes and levies, any other charges as applicable

Note: Taxes, both present & future, such as Service Tax, Value Added Tax, etc. payable as will be applicable

Break-up of Rate

Floor Rise Charge

Rs. 20/- per Sq. ft.

Loan
  ING Vysya Bank
HDFC
Central Bank of India
State Bank of India
IDBI Bank
Dena Bank
  First Blue Home Finance
LIC Housing Finance
Citibank
Axis Bank
ICICI
Deutsche Bank
Reliance Home Finance
Tata Capital Housing Finance
DHFL
Indiabulls Housing Finance
United Bank of India
Contact
ALCOVE MARKETING
68B, Harish Mukherjee Road,
Kolkata – 700 025
Ph:+91 33 3984 2210
Fax:+91 33 3984 2138
Email:marketing@alcoverealty.in
Enquiry